| 5.9.15 - hmmm, is it a 14 seer?! Yes, yes I think it is.. |
![]() |
| guest room 5.9.15 |
Not too long after this, we had our inspection (May 12) and our walk through (May 14). The superintendent and Mike, the stupid realtor on the builder's side, met us there and scheduled about an hour to two hour walk through. It took us closer to 4 hours! We were very thorough, and I'm almost certain we pissed Tim off pretty good, the superintendent... but who gives a shit, this is OUR house!
We found some minor issues with the paint and wall markings, some of the tile grout needed to be addressed and a couple tiles replaced (one or two). There were also some issues with the cabinets that needed to be smoothed out and fixed. And the outside of the house needed to be painted too, seems like they may have forgotten to do a second coat.
They assured us it would be about 5-7 days for them to fix all of the issues, then we could get the keys and move our happy asses in! Time for more packing at the house! pack pack pack!